Economical prefab steel structure for warehouse workshop storage building with discount, temporary refugee camp container scheme

Affordable Prefabricated Steel Structure for Warehouse Workshop Storage Building with Discount, temporary refugee camps container plansOur quality control:1. SGS720H salt test report2. TUV and ISO certified3. Mass production capbility4. Rich experience in mega project management5. Good relation with famous industry suppliersOur

Featured Products

Affordable Prefabricated Steel Structure for Warehouse Workshop Storage Building with Discount, temporary refugee camps container plans

Our quality control:
1. SGS720H salt test report
2. TUV and ISO certified
3. Mass production capbility
4. Rich experience in mega project management
5. Good relation with famous industry suppliers

Our advantages:
-Light steel structure profile production lines
Affordable Prefabricated Steel Structure for Warehouse Workshop Storage Building with Discount, Temporary Refugee Camps Container Plans
  
6 Steel profile lines-Newzealand                       8 Metalling lines (56ton/day)                              Raw steel from top supplliers
-Finished steel profile
Affordable Prefabricated Steel Structure for Warehouse Workshop Storage Building with Discount, Temporary Refugee Camps Container Plans
 
C & U steel: 89, 250, 300mm                                   Strenthened U steel Purlin                             Strengthened U steel roofing

Test method
-Test method: GB/T10125-2012
-Sample placement: 15°~25° with vertical direction
-Settlement salt solution concentration: (50+/-5) g/l NaCl
-Temperature inside the test chamber: (35+/-2) ºC
-Settlement rate of salt spray: 1~2ml (80cm2.h)
-Settlement salt solution pH value (25ºC+/-2ºC): 6.5~7.2
-Exposure time: 720 hours (check once every 96 hours)
-Cleaning method: natural dry for 0.5~1.0 hours, then rinse with water of temperature not higher than 40ºC, then dry immediately.
Affordable Prefabricated Steel Structure for Warehouse Workshop Storage Building with Discount, Temporary Refugee Camps Container Plans


Key features:
1) Strengthened light steel structures ensures the house resisting heavy wind of 120km/h and 7 grade earthquakes.
2) By comparison to the civil building, it features easy construction,low cost,time-saving,labor saving and convenient transportation.
3) Anti-rusting treatment by galvanized mg-al, which can be normally used for  more than 15 years without any building garbage.
4) It's fire retardant and perfect insulation performance.
5) It is environmental-friendly materials,it can be assembled and disassembled six times.
6) Level concrete floor can meet the requirement of the foundation.
7) Nice appearance, many wall color options,roof and steel structure.
8) Fastly construct, time save

Production capacity
Frame profile materialC89, U89 at 0.8-1.2mm light steel, 3 production lines
C89, U89 at 0.8-1.6mm light steel, 2 production lines
Floor profile materialC250-300, U250-300mm light steel, 1 production line
U250-300 at 0.6-1.6mm light steel, 1 production line
Purlin profile material40*30 at 0.8-1.2mm light steel, 1 production line
Roof water proof15 years warranty
Wall Panel35 years warranty
Window5 years warranty
Door5 years warranty
Frame profile warranty50 years warranty
OSB panel1220*2440*9mm
Asbestos panelsandwich panel

-Factory tour
Affordable Prefabricated Steel Structure for Warehouse Workshop Storage Building with Discount, Temporary Refugee Camps Container Plans
Overview
Affordable Prefabricated Steel Structure for Warehouse Workshop Storage Building with Discount, Temporary Refugee Camps Container Plans
Metalling workshop
Affordable Prefabricated Steel Structure for Warehouse Workshop Storage Building with Discount, Temporary Refugee Camps Container Plans
Italy OMIPA PC-UV extrusion line
Affordable Prefabricated Steel Structure for Warehouse Workshop Storage Building with Discount, Temporary Refugee Camps Container Plans

How to Calculate the Cost of Importing Light Gauge Steel Prefab from China

First step, you shall decide the square footage of your project before getting the price of importing prefab materials.
Second step, the import customs duties in your country
Third step, logistic and other order processing cost

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours